Act as a tree. Save energy.

Direct Air Capture, built into your building's HVAC.

acDAC12 turns the air-handling system a building already has into a carbon capture platform: CO₂ is captured from the incoming air, indoor air gets cleaner, and the AHU uses less energy.

A Qatar-based clean-tech company. Developed at Hamad Bin Khalifa University, based at Qatar Science & Technology Park, Doha.

Capture CO₂Direct air capture from the incoming air, before it enters the building.
Improve indoor air qualityIntegrated air treatment supplies CO₂-lean air to the people inside.
Reduce energy useThe integrated design is targeted at lower HVAC energy consumption.
Support net zeroCaptured CO₂ is recovered and supplied to off-takers instead of released.

CP-1 commercial configuration

Designed around a standard air handling unit

24,000 m³/hair-handling capacity per module
~8.5 kg/hCO₂ capture rate per commercial module
~10%energy saving per AHU
50–60%reduction in indoor CO₂

Current planning figures for the CP-1 commercial configuration, subject to actual operating performance and availability. Validated results will be published as the deployment programme progresses.

Who we are

Your building can do more than cool the air.

acDAC12 is a Qatar-based clean-tech company developing innovative Direct Air Capture technology integrated into existing building HVAC systems.

Our solution transforms air-handling infrastructure into carbon capture platforms, while targeting improved indoor air quality and reduced HVAC energy consumption. The captured CO₂ is recovered and supplied to off-takers such as greenhouses, food and beverage producers, and industrial customers.

The problem outdoors

Standalone direct air capture plants need land, fans and energy of their own, which has kept carbon removal slow and costly.

The problem indoors

Sealed, air-conditioned buildings pull in large volumes of outdoor air all day, and CO₂ builds up inside wherever people gather.

The acDAC12 approach

A solid-sorbent capture module on the outdoor-air intake of the AHU. The air the building already moves does the work, the CO₂ is collected rather than released, and the air supplied inside is cleaner.

Technology

How it works

The module sits on the outdoor-air intake, ahead of the air handling unit. Air passes through it on its normal path, and the CO₂ is captured and collected in five steps.

  1. Intake

    Outdoor air is drawn in at roof level, before it reaches the air handling unit.

  2. Capture

    A specially designed solid-sorbent filter module holds the CO₂ and lets the air through.

  3. Supply

    CO₂-lean air continues into the AHU and is cooled and supplied to every floor.

  4. Regenerate

    A separate regeneration circuit releases the captured CO₂ and collects it, rather than returning it to the air stream.

  5. Use

    The recovered CO₂ is supplied to off-takers: greenhouses, food and beverage, and industry.

Specifications

The CP-1 commercial module

Our commercial configuration is sized for integration with a standard air handling unit. The small pilot validated the sorbent and filter modules; CP-1 scales them up.

IntegrationOutdoor-air intake of an existing AHURetrofit, no new land or building
Air-handling capacity~24,000 m³/hourper module
CO₂ capture rate~8.5 kg/hourper commercial module
Indicative annual capture~55.8 t at 18 h/day~74.5 t at continuous 24-hour operation
Capture mediumSolid-sorbent filter modulesFunctional sorbent formulation, specially designed contact modules
CO₂ handlingSeparate regeneration circuitCaptured CO₂ is released, collected and recovered for supply
Indoor air quality50–60% lower indoor CO₂current planning target
AHU energy~10% saving per AHUcurrent planning target

Planning figures for the CP-1 configuration, based on the latest commercial planning information. Subject to actual operating performance and availability. Detailed process conditions are available to qualified partners under NDA.

How it behaves in a building: a live schematic of one module on a tower, from outdoor intake to collected CO₂, with indoor CO₂ and AHU energy readouts.

Applications

Built for any building with an air handling unit

Wherever outdoor air is conditioned and supplied to people, an acDAC12 module can capture CO₂ on the way in.

Commercial buildings

Towers and mixed-use developments with large central AHUs and high occupancy.

Hotels

Guest comfort, cleaner indoor air and a measurable sustainability story for every stay.

Offices

Lower indoor CO₂ for the people who work there, with the AHU doing the capture work.

Hospitals

Facilities where indoor air quality matters most and ventilation runs around the clock.

Industrial facilities

Large air volumes and on-site demand for the recovered CO₂.

Greenhouses

Capture on the air intake and supply the recovered CO₂ straight to the crops.

Where the CO₂ goes

The captured CO₂ is recovered and supplied to customers who use it every day, turning a building's air handling into a source of a useful product.

  • Greenhouses
  • Food & beverage
  • Industrial customers

From research to deployment

Pilot validated. Commercial deployment underway.

The technology grew out of research at HBKU's Qatar Environment and Energy Research Institute. A working pilot has been built and tested, and the first commercial project is now in tender.

The Pilot-1 direct air capture unit during factory testing: a stainless-steel module on a wheeled frame with its control cabinet and regeneration circuit.
Pilot-1 during factory testing
Completed

Pilot-1

A small pilot built around a functional sorbent formulation and specially designed filter modules, assembled and tested in the factory. The results underpin the commercial design.

In progress

CP-1: first commercial project

The commercial configuration, sized for an AHU handling around 24,000 m³/hour, is currently in tender. First installations are planned for Doha Tower and the HBKU Research Building, targeted for the end of March 2027.

~24,000 m³/h
AHU capacity
~8.5 kg/h
CO₂ capture rate
2 sites
Doha Tower, HBKU
Mar 2027
target installation
  1. ResearchDAC-in-HVAC concept and sorbent development at QEERI, HBKU
  2. Pilot-1Small pilot built and factory-tested
  3. CP-1 tenderCommercial module in detailed engineering and tender
  4. First installationsDoha Tower and HBKU Research Building, target March 2027

Our mission

To develop and commercialize energy-efficient DAC technologies that integrate CO₂ removal into buildings and industry, improve indoor air quality, and enable sustainable CO₂ utilization, contributing to a cleaner environment and a low-carbon future.

Our vision

To become a global leader in integrated DAC solutions, transforming buildings and industry into platforms for carbon removal while positioning Qatar as a hub for DAC innovation and manufacturing.

Qatar National Vision 2030

Built in Qatar, for Qatar's goals

acDAC12 supports all four pillars of the national vision, and positions Qatar as a home for climate technology and manufacturing.

Human development

Healthier indoor environments for the people who live and work in Qatar's buildings.

Environmental development

Buildings that capture carbon while using less energy, supporting national climate goals.

Economic development

A home-grown clean-tech company creating high-value jobs and a new supply of CO₂ for local industry.

Social development

Partnerships with leading institutions that show regional leadership on climate.

Updates

Latest from acDAC12

All updates

Updates will appear here.

Team

The people behind acDAC12

Dr. Abdulkarem I. Amhamed

Dr. Abdulkarem I. Amhamed

Founder & Chairman

Eng. Aimen Aboujoukh

Eng. Aimen Aboujoukh

Chief Executive Officer

Dr. Yasser Mohamed

Dr. Yasser Mohamed

Technology Development Director & CTO

Partner with us on CP-1

We are moving from pilot validation to commercial deployment, starting in Qatar as a gateway to the GCC. We're talking to building owners, HVAC partners, CO₂ off-takers and investors.

Start a conversation
  • Technology developed at HBKU's QEERI and validated in Pilot-1
  • Commercial CP-1 module in tender, first installations targeted for 2027
  • Retrofit model: uses the HVAC infrastructure buildings already have
  • Recovered CO₂ supplied to greenhouse, food and beverage, and industrial off-takers

Common questions

Does it replace our air handling unit?

No. The module integrates with the outdoor-air intake of the AHU you already have. The AHU keeps cooling and supplying air as before; it now receives CO₂-lean air.

How much CO₂ does one module capture?

The CP-1 commercial module is planned around 8.5 kg of CO₂ per hour, which is roughly 55.8 tonnes a year at 18 operating hours a day, or 74.5 tonnes at continuous operation. These are current planning figures, subject to actual operating performance.

What happens to the captured CO₂?

A separate regeneration circuit releases and collects it, so it is recovered rather than returned to the air stream. It is then supplied to off-takers such as greenhouses, food and beverage producers and industrial customers.

Where has the technology been installed?

A small pilot, Pilot-1, has been built and factory-tested. The first commercial installations, at Doha Tower and the HBKU Research Building, are in tender and targeted for the end of March 2027.

Can you share the process details?

The sorbent formulation and the detailed regeneration and CO₂ handling conditions are proprietary. Process diagrams and specifications are available to qualified partners under NDA.

Contact

Talk to us

Building owners, HVAC partners, CO₂ off-takers and investors: tell us about your project and we'll get back to you within one business day.

Office

Qatar Science & Technology Park
Doha, Qatar

Hours

Sunday to Thursday, 8 AM to 5 PM (AST)

Enter your name.
Enter a valid email address, like name@company.com.
Building type, AHU capacity and location help us prepare.Write a short message so we know how to help.
Your message goes to info@acdac12.com.